A rendering of the Interstate 5 bridge replacement span.The Interstate 5 bridge that collapsed over the Skagit River in Washington in late May and caused major disruption of the West Coast corridor reopened this weekend after a permanent span of bridge was added, replacing a temporary span that had been in place since mid-June.
The bridge collapsed after a truck struck one of the support beams, says a Washington Department of Transportation report. The trucker piloting the oversized load that made contact with the bridge says he felt crowded by a tractor-trailer passing him on the left and moved right, when the 2010 Kenworth struck a load-bearing part of the bridge.
No one was hurt or injured. Two passenger vehicles, however, did fall into the river.
The truck had a pilot vehicle that had a clearance pole 16 feet, 2 inches high, which reportedly cleared the bridge. The driver said he thought his load was 15 feet, 9 inches tall. The lowest portions of the bridge, however, were 14 feet, 8 inches.
The bridge officially reopened Sunday, Sept. 15, at 2 p.m.



![DTNA Rendering[1]](https://img.ccjdigital.com/files/base/randallreilly/all/image/2013/09/ccj.DTNA-Rendering1.png?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)
![MRT_XDS2_Rtd_cut[1]](https://img.ccjdigital.com/files/base/randallreilly/all/image/2013/09/ccj.MRT_XDS2_Rtd_cut1.png?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)


![Volvo Vnl Sleeper Review[20]](https://img.ccjdigital.com/mindful/rr/workspaces/default/uploads/2025/11/volvo-vnl-sleeper-review20.lrVppY9UDR.jpg?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)


